Download current revision of this file
CAFS-JV_DC8_20170205.ict
- Mission: ATom, ATom-2 Deployment (1/26/2017-2/21/2017; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20170205 (Sun, Feb 5, 2017) (Flight Report)
- File Code: CAFS-JV, DC8
- Measurement PI: Hall
- Description: NCAR CAFS (CCD-based Actinic Flux Spectrometers) Calculated Photolysis Frequencies
- Instrument: CAFS
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R3 | 7.05 MB | Fri, May 17, 2019 |
R2 | 7.53 MB | Thu, Dec 7, 2017 |
R1 | 7.53 MB | Tue, Jun 6, 2017 |
R0 | 7.53 MB | Tue, Feb 7, 2017 |