Download current revision of this file
BC19951107.ER2
- Mission: STRAT (3/24/1995-12/19/1996; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 19951107 (Tue, Nov 7, 1995)
- File Code: BC
- Measurement PI: Elkins
- Description: ACATS total Br,Cl
- Instrument: ACATS
- File Format: Archive (plain-text) data file in Ames format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 8.38 KB | Fri, Aug 7, 1998 |
R0 | Tue, Mar 24, 1998 |