Download current revision of this file
AWAS_GHawk_20140306.ict
- Mission: ATTREX, 2014 Deployment (1/15/2014-3/14/2014; Mission Website)
- Measurement Platform: Global Hawk aircraft (Aircraft Webpage)
- Measurement Date: 20140306 (Thu, Mar 6, 2014) (Flight Report)
- Current Revision: R0
- File Code: AWAS, GHawk
- Measurement PI: Atlas
- Description: AWAS trace gas mixing ratios
- Instrument: AWAS
- File Format: Archive (plain-text) data file in ICARTT format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 26.28 KB | Tue, Sep 9, 2014 |