The website is undergoing a major upgrade that began Friday, October 11th at 5:00 PM PDT. The new upgraded site will be available no later than Monday, October 21st. Until that time, the current site will be visible but logins are disabled.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
31 |
||||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
Flight Testing
2014-06-02 - 2014-09-01
|
Local Flights
2014-09-02 - 2014-09-05
|
|
||||
«
Phase Inspection
2014-08-11 - 2014-09-09
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Carbon and Methane Experiment
2014-08-20 - 2014-09-05
|
|
|||||
«
AVIRIS-ng HyspIRI prep underflights
2014-08-09 - 2014-09-05
|
|
|||||
«
HS3-Flight
2014-08-19 - 2014-09-29
»
|
||||||
«
Comm. Sys. Upgrade [Place Holder]
2014-08-12 - 2014-09-15
»
|
||||||
«
Aircraft Integration for VS14 Deployment (NON-UAVSAR)
2014-08-18 - 2014-09-08
»
|
||||||
«
Deconfigure from AirMOSS
2014-08-27 - 2014-09-01
|
Head Worn Display
2014-09-02 - 2014-11-25
»
|
|||||
ARISE Mission
2014-09-01 - 2014-10-03
»
|
||||||
UAS in the NAS Avionics Upgrade
2014-09-01 - 2014-09-12
»
|
||||||
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
CARVE-Deployment
2014-09-02 - 2014-09-16
»
|
||||||
ASCENDS2 Instrument Download
2014-09-03 - 2014-09-05
|
|
|||||
AirBOS2 Integration
2014-09-03 - 2014-09-11
»
|
||||||
Viscuglia Check-Out Prof Flights
2014-09-04 - 2014-09-05
|
|
|||||
|
|
|||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
ARISE Mission
2014-09-01 - 2014-10-03
»
|
||||||
Direct Return Mission
2014-09-07 - 2014-09-11
|
Reconfigure for AirMOSS
2014-09-12 - 2014-09-17
»
|
|||||
«
Phase Inspection
2014-08-11 - 2014-09-09
|
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
|||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
UAS in the NAS Avionics Upgrade
2014-09-01 - 2014-09-12
|
|
|||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HS3-Flight
2014-08-19 - 2014-09-29
»
|
||||||
«
CARVE-Deployment
2014-09-02 - 2014-09-16
»
|
||||||
«
Comm. Sys. Upgrade [Place Holder]
2014-08-12 - 2014-09-15
»
|
||||||
«
Aircraft Integration for VS14 Deployment (NON-UAVSAR)
2014-08-18 - 2014-09-08
|
VS14 Deployment (NON-UAVSAR)
2014-09-09 - 2014-09-25
»
|
|||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
«
AirBOS2 Integration
2014-09-03 - 2014-09-11
|
|
|
||||
|
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
|||||
|
Chlorophyll Flouresensce 2014
2014-09-10 - 2014-09-29
»
|
|||||
|
|
|
||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
ARISE Mission
2014-09-01 - 2014-10-03
»
|
||||||
«
VS14 Deployment (NON-UAVSAR)
2014-09-09 - 2014-09-25
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HS3-Flight
2014-08-19 - 2014-09-29
»
|
||||||
«
CARVE-Deployment
2014-09-02 - 2014-09-16
|
|
AirMOSS Mission CA, Calibration (FRs 14G015/14G016)
2014-09-18 - 2014-09-28
»
|
||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
Chlorophyll Flouresensce 2014
2014-09-10 - 2014-09-29
»
|
||||||
«
Comm. Sys. Upgrade [Place Holder]
2014-08-12 - 2014-09-15
|
CONVEX and LEEM-Faraday
2014-09-16 - 2014-09-23
»
|
|||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
«
Reconfigure for AirMOSS
2014-09-12 - 2014-09-17
|
|
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||
|
HyspIRI
2014-09-15 - 2014-11-22
»
|
|||||
AirBOS2 Flights
2014-09-15 - 2014-10-03
»
|
||||||
OIB Antarctic Instrument Upload
2014-09-15 - 2014-10-03
»
|
||||||
|
|
|
|
SpaceX CRS4 Rocket Launch Support
2014-09-20 - 2014-09-21
»
|
||
|
||||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
ARISE Mission
2014-09-01 - 2014-10-03
»
|
||||||
«
VS14 Deployment (NON-UAVSAR)
2014-09-09 - 2014-09-25
|
|
|
||||
«
SpaceX CRS4 Rocket Launch Support
2014-09-20 - 2014-09-21
|
|
UAS in the NAS Flight Testing
2014-09-23 - 2014-10-23
»
|
||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AirBOS2 Flights
2014-09-15 - 2014-10-03
»
|
||||||
«
CONVEX and LEEM-Faraday
2014-09-16 - 2014-09-23
|
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
|||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||||
«
HS3-Flight
2014-08-19 - 2014-09-29
»
|
||||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
Chlorophyll Flouresensce 2014
2014-09-10 - 2014-09-29
»
|
||||||
«
AirMOSS Mission CA, Calibration (FRs 14G015/14G016)
2014-09-18 - 2014-09-28
»
|
||||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
«
OIB Antarctic Instrument Upload
2014-09-15 - 2014-10-03
»
|
||||||
|
|
|
|
|
||
1 |
2 |
3 |
4 |
|||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
ARISE Mission
2014-09-01 - 2014-10-03
|
|
|||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
||||||
«
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AirBOS2 Flights
2014-09-15 - 2014-10-03
|
|
|||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||||
«
UAS in the NAS Flight Testing
2014-09-23 - 2014-10-23
»
|
||||||
«
HS3-Flight
2014-08-19 - 2014-09-29
|
HS3-Download
2014-09-30 - 2014-10-03
|
|
||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
Chlorophyll Flouresensce 2014
2014-09-10 - 2014-09-29
|
|
California Science Flights
2014-10-01 - 2014-12-12
»
|
||||
«
AirMOSS Mission CA, Calibration (FRs 14G015/14G016)
2014-09-18 - 2014-09-28
|
Ejection Seat Inspection
2014-09-29 - 2014-10-03
|
|
||||
AirMOSS Mission OR/SK (FR 14G016)
2014-09-28 - 2014-10-08
»
|
||||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
«
OIB Antarctic Instrument Upload
2014-09-15 - 2014-10-03
|
|
|||||
|
PV Upload
2014-09-29 - 2014-10-03
|
|
||||
|
|
NAIMS
2014-10-01 - 2014-11-30
»
|
||||
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
|
CARVE-Deployment
2014-10-02 - 2014-10-16
»
|
|||||
|
|
|