December 2013

Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
7
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« maintenance 2013-10-28 - 2013-12-23
»
« Annual Maintenance 2013-11-02 - 2013-12-06
 
 
»
« DC-8 at Heavy C Check Facility 2013-11-12 - 2014-03-01
»
« Annual Maintenance 2013-11-12 - 2013-12-04
 
 
Maintenance 2013-12-06 - 2014-01-03
»
« A Check 2013-11-18 - 2013-12-11
»
« Minor Ops Inspection 2013-11-20 - 2014-02-28
»
« 992 Maintenance 2013-11-27 - 2014-01-21
»
« Scanning L-band Radar Active Passive 2013-10-07 - 2013-12-18
»
« Local Flights 2013-11-14 - 2014-01-15
»
Reising IIP radar for SWOT 2013-12-01 - 2014-01-15
»
« Operation Ice Bridge Antarctica- Deploymnet 2013-11-11 - 2013-12-02
 
 
 
 
NGC Work 2013-12-06 - 2014-06-30
»
 
Maintenance 2013-12-02 - 2013-12-31
»
 
 
8
9
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« maintenance 2013-10-28 - 2013-12-23
»
»
« DC-8 at Heavy C Check Facility 2013-11-12 - 2014-03-01
»
« A Check 2013-11-18 - 2013-12-11
 
 
 
 
« Minor Ops Inspection 2013-11-20 - 2014-02-28
»
« 992 Maintenance 2013-11-27 - 2014-01-21
»
« Maintenance 2013-12-02 - 2013-12-31
»
« Maintenance 2013-12-06 - 2014-01-03
»
« Scanning L-band Radar Active Passive 2013-10-07 - 2013-12-18
»
« Local Flights 2013-11-14 - 2014-01-15
»
« Reising IIP radar for SWOT 2013-12-01 - 2014-01-15
»
« NGC Work 2013-12-06 - 2014-06-30
»
 
Solar Cell 2013-12-09 - 2013-12-13
 
 
ISRNET Demo #1 Deployment to Yuma 2013-12-09 - 2013-12-13
 
 
Hawkeye/ATTREX Payload IT Test 2013-12-09 - 2013-12-13
 
 
Maintenance 2013-12-10 - 2014-02-21
»
CARVE Wind Instr. Cal. Flight 2013-12-10 - 2013-12-12
 
 
 
 
 
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« maintenance 2013-10-28 - 2013-12-23
»
»
« DC-8 at Heavy C Check Facility 2013-11-12 - 2014-03-01
»
« Minor Ops Inspection 2013-11-20 - 2014-02-28
»
« 992 Maintenance 2013-11-27 - 2014-01-21
»
« Maintenance 2013-12-02 - 2013-12-31
»
« Maintenance 2013-12-06 - 2014-01-03
»
« Maintenance 2013-12-10 - 2014-02-21
»
« Scanning L-band Radar Active Passive 2013-10-07 - 2013-12-18
 
Range Surveillance (Antares) 2013-12-19 - 2013-12-22
»
« Local Flights 2013-11-14 - 2014-01-15
»
« Reising IIP radar for SWOT 2013-12-01 - 2014-01-15
»
« NGC Work 2013-12-06 - 2014-06-30
»
 
Major Ops Inspection 2013-12-16 - 2014-08-18
»
AirSWOT Upload 2013-12-16 - 2013-12-24
»
ISRNET Deintegration & Download 2013-12-16 - 2013-12-20
 
 
Hawkeye/ATTREX CST 2013-12-16 - 2013-12-17
 
 
 
 
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« maintenance 2013-10-28 - 2013-12-23
 
 
 
 
 
 
»
« DC-8 at Heavy C Check Facility 2013-11-12 - 2014-03-01
»
« Minor Ops Inspection 2013-11-20 - 2014-02-28
»
« 992 Maintenance 2013-11-27 - 2014-01-21
»
« Maintenance 2013-12-02 - 2013-12-31
»
« Maintenance 2013-12-06 - 2014-01-03
»
« Maintenance 2013-12-10 - 2014-02-21
»
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« Local Flights 2013-11-14 - 2014-01-15
»
« Reising IIP radar for SWOT 2013-12-01 - 2014-01-15
»
« Range Surveillance (Antares) 2013-12-19 - 2013-12-22
 
 
 
 
 
 
 
« NGC Work 2013-12-06 - 2014-06-30
»
« AirSWOT Upload 2013-12-16 - 2013-12-24
 
 
 
 
 
 
 
 
1
2
3
4
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
 
 
 
 
 
« DC-8 at Heavy C Check Facility 2013-11-12 - 2014-03-01
»
« Minor Ops Inspection 2013-11-20 - 2014-02-28
»
« 992 Maintenance 2013-11-27 - 2014-01-21
»
« Maintenance 2013-12-02 - 2013-12-31
 
 
 
 
 
« Maintenance 2013-12-06 - 2014-01-03
 
 
« Maintenance 2013-12-10 - 2014-02-21
»
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« Local Flights 2013-11-14 - 2014-01-15
»
« Reising IIP radar for SWOT 2013-12-01 - 2014-01-15
»
« NGC Work 2013-12-06 - 2014-06-30
»