Seagrass; SIERRA integration and testing of payload
2012-03-21 - 2012-04-01
|
G-LiHT 2012
2012-04-02 - 2012-04-06
|
|
||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
Repair a fuel line leak
2012-01-31 - 2012-04-01
|
DC3 Upload
2012-04-02 - 2012-05-03
»
|
|||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Maintenance and Aircraft Modfications
2012-02-01 - 2012-04-15
»
|
||||||
«
Maintenance / Local Flight Ops
2012-03-02 - 2012-04-15
»
|
||||||
A/C Transits to Iceland
2012-04-01 - 2012-04-02
|
H-2 Payload Interface Frame (PIF) Fit Check & Match Drill
2012-04-03 - 2012-04-05
|
|
|
|||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Operation Ice Bridge
2012-03-12 - 2012-05-25
»
|
||||||
«
MABEL Iceland Deployment
2012-03-29 - 2012-04-26
»
|
||||||
|
|
|
|
|||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Maintenance and Aircraft Modfications
2012-02-01 - 2012-04-15
»
|
||||||
«
Maintenance / Local Flight Ops
2012-03-02 - 2012-04-15
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Operation Ice Bridge
2012-03-12 - 2012-05-25
»
|
||||||
«
MABEL Iceland Deployment
2012-03-29 - 2012-04-26
»
|
||||||
«
DC3 Upload
2012-04-02 - 2012-05-03
»
|
||||||
|
AFRL - CASH
2012-04-09 - 2012-04-27
»
|
|||||
Seagrass: Crows Landing Test Flight window
2012-04-09 - 2012-04-13
|
|
|||||
MIZOPEX Local Flights
2012-04-10 - 2012-05-31
»
|
||||||
|
|
|
||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Maintenance and Aircraft Modfications
2012-02-01 - 2012-04-15
|
Seagrass: FRR window
2012-04-16 - 2012-04-20
|
|
||||
«
Maintenance / Local Flight Ops
2012-03-02 - 2012-04-15
|
CDC Documentary
2012-04-16 - 2012-04-20
|
|
||||
«
AFRL - CASH
2012-04-09 - 2012-04-27
»
|
||||||
«
MIZOPEX Local Flights
2012-04-10 - 2012-05-31
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Operation Ice Bridge
2012-03-12 - 2012-05-25
»
|
||||||
«
MABEL Iceland Deployment
2012-03-29 - 2012-04-26
»
|
||||||
«
DC3 Upload
2012-04-02 - 2012-05-03
»
|
||||||
|
Deconfigure from AirMOSS
2012-04-16 - 2012-04-20
|
|
||||
CARVE Upload
2012-04-16 - 2012-05-04
»
|
||||||
|
Dial Laser Calibrations
2012-04-19 - 2012-04-25
»
|
|||||
|
|
|||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
AFRL - CASH
2012-04-09 - 2012-04-27
|
|
|||||
«
MIZOPEX Local Flights
2012-04-10 - 2012-05-31
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Operation Ice Bridge
2012-03-12 - 2012-05-25
»
|
||||||
«
MABEL Iceland Deployment
2012-03-29 - 2012-04-26
|
|
|
||||
«
DC3 Upload
2012-04-02 - 2012-05-03
»
|
||||||
«
CARVE Upload
2012-04-16 - 2012-05-04
»
|
||||||
«
Dial Laser Calibrations
2012-04-19 - 2012-04-25
|
|
|
|
|||
|
Direct Return Mission
2012-04-23 - 2012-04-28
|
|||||
LAC Upload
2012-04-23 - 2012-04-25
|
|
|
|
|||
ARMD MUTT(Multi Utility Technology Test bed) FLIGHTS
2012-04-24 - 2012-04-27
|
|
|||||
Operation IceBridge
2012-04-24 - 2012-05-15
»
|
||||||
|
|
|||||
1 |
2 |
3 |
4 |
5 |
||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
MIZOPEX Local Flights
2012-04-10 - 2012-05-31
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Operation Ice Bridge
2012-03-12 - 2012-05-25
»
|
||||||
«
Operation IceBridge
2012-04-24 - 2012-05-15
»
|
||||||
«
DC3 Upload
2012-04-02 - 2012-05-03
|
|
|
||||
«
CARVE Upload
2012-04-16 - 2012-05-04
|
|
|||||
|
|
|
|
Paint N928 Aircraft
2012-05-04 - 2012-06-08
»
|
||
Phase
2012-05-01 - 2012-08-15
»
|
||||||
Reconfigure for AirMOSS
2012-05-01 - 2012-05-06
»
|
||||||
AVIRIS & LAC Upload
2012-05-02 - 2012-05-04
|
||||||